This day is about setting up to work and the diving in. Wathen Drywall’s 3 man crew split into 2 groups. One guy started on painting on the 3
rd floor while Mike Wathen and his helper start demo on the 2
nd floor living room ceiling by far the biggest job for the turnover of the apartment. The pictures show the before pictures and then snapshots of the work completed in the living room the 1
st day. Mike removed light fixture for demo to protect it and rehung after that section of drywall was fastened. Insulation was installed to replace the old blown in insulation. I was pleased with what was accomplished on day 1.