Living room wall repair
Tuck pointing
Gutter repair
February 28, 2012
Mike Wathen’s crew is doing a fine job. Work on the inside of the house is progressing but the steps needed to make the wall repairs are slow and not picture worthy at this point.
With the incredible weather we are having in Cincinnati we took advantage of it to get some outdoor work completed. First we bypassed the clasped storm water pipe for the gutter and filled in the sinkhole that was created.
Thursday, February 23, 2012
Day one February 22
This day is about setting up to work and the diving in. Wathen Drywall’s 3 man crew split into 2 groups. One guy started on painting on the 3rd floor while Mike Wathen and his helper start demo on the 2nd floor living room ceiling by far the biggest job for the turnover of the apartment. The pictures show the before pictures and then snapshots of the work completed in the living room the 1st day. Mike removed light fixture for demo to protect it and rehung after that section of drywall was fastened. Insulation was installed to replace the old blown in insulation. I was pleased with what was accomplished on day 1.